The Maryl Design/Build Program is especially attractive when the design and construction process involves off-island owners, consultants and material suppliers – coordination, communication and efficiency are all naturally expedited by thorough, experienced, on-site Maryl management.

Maryl Group

Maryl Group

The traditional building model places owners in a precarious middle ground, responsible for communicating, coordinating, arbitrating and resolving differences with multiple disciplines that often have conflicting interests – interests not always shared by the owner.

Seasoned developers who have found themselves exposed to significant design adequacy risks, management of multiple simultaneous contracts and unsatisfactory outcomes from inherently conflicting interests increasingly see the merits of design/build.

Design/Build's inherent strength is continual, single-source responsibility throughout the construction process.

  • Owner no longer responsible for efficacy of design and cost
  • Integrated, value engineering
  • Early contractor involvement enhances constructability
  • Single point of contact and total responsibility
  • Clarified and streamlined communication
  • Virtually eliminates contract modification and litigation
  • Earliest knowledge of firm costs
  • Fastest project delivery system
  • Full team input promotes efficiency and innovation
  • Requires less re-engineering as errors are fixed - not used as excuses
  • Quality is enhanced as cost and time issues are addressed by the team
  • Owner no longer responsible for cascading levels and reliability of QA/QC